Campus Facilities and Projects
Call Boxes
Blue lights are being added to call boxes, to make idenification
easier. View
call box locations.
Lighting
- East Stadium column lights are currently scheduled to stay on all
night.
- The City-Parish has upgraded lighting along Chimes Street and is planning
to upgrade lighting on Gourrier Lane east of Transportation Research.
Recenlty completed lighting projects on campus
- ROTC - Added 7 wall packs added to building.
- Julian C. Miller - Added 4 wall packs.
- Geology Building - Added 2 wall packs to building.
- Human Ecology - Added 4 wall packs to building.
- Parker Ag Center Drive - Added 7 poles and fixtures.
- Powerhouse - Upgraded or added 5 wall packs.
- Swine Palace - Added 7 wall packs to building.
- South Stadium Drive near Nicholson Dr. - Added 3 23' poles with 3
cobra fixtures.
- South Campus Drive near Laville - Replace and upgrade 6 fixtures
and poles.Business and Technology - Added 2 wall packs to north side
of building.
- Atkinson Hall - Added 2 wall packs to north side of building.
- CEBA Storage Building - Added 1 wall pack to northeast corner of
building.
- CEBA West Parking lot - Added 2 Flood fixtures to and existing pole
on south end of lot.
- School of Music - Added 1 wall pack to northwest corner of building.
- South Stadium Parking lot - Upgraded 8 flood fixtures on 4 existing
poles.
- West Stadium Parking lot - 3 new poles and 6 flood lights are being
added.
- Foundations have been poured and wire has been pulled. Poles to be
installed May 7.
- North Pleasant Hall lot - Added 1 new flood fixture.
- Life Sciences & North Knapp parking lots - Added 1 wall pack
and 3 flood fixtures.
- Electrical Engineering - Added 3 flood fixtures to existing poles
on north and west sides of building.
- Foster Hall - Upgraded flood fixture on North side of building.
- Dalrymple parking lot - Added 1 flood fixture on south end of building.
- Turead Hall - 4 new wall packs to be installed after May 18.
- East Alex Box - Contractor to install 4 poles with 4 floods and 4
street lights. - Work to begin May 7.
- Quadrangle - Designing upgrade.
- Burbank and Gourrier Lane - finalizing design. Design must be approved
by
- DOTD prior to construction.
- Gym Armory - adding 3 poles and 3 fixtures with landscaping project.
- Parade Grounds Sidewalk - Designing upgrade. Power has been brought
to site.
- International Cultural Center - Added 4 wall packs.
|